Residential Building

University District

Residential Building

University District

Site

 Tripoli-University District

space

14560 m²

type

 residential building

finishing

European finishing

the condition

 Under construction

price

15,000,000 dl

payment system

Payments based on construction period

Site

 Tripoli-University District

space

14560 m²

type

 residential building

finishing

European finishing

the condition

 Under construction

price

15,000,000 dl

payment system

Payments based on construction period

About the project

A plot of land on which a residential project is built, with an area of ​​459.67 square meters

The project is a residential building with a modern design, befitting the designs of the neighboring buildings in the area, as the location of the building is in the university district near the University of Tripoli, one of the largest public Libyan universities.

Project Features

The project is considered one of the strategic locations in the capital, Tripoli, as all services are available and close to commercial markets and various service facilities, as well as the main and secondary paved roads and the lighthouse, where all public and private means of transportation are available.
The Damas 7 building in the university district is within the general plan of the Libyan state. It has a direct link to its public services, including sewage and the General Electricity Company’s network. The building also contains a private car park for its residents.

Components of the project

The property consists of:-
⦁ Single ground independent villa.
⦁ Four floors, each floor contains two apartments.
⦁ Parking for residents of the building.

About the project

A plot of land on which a residential project is built, with an area of ​​459.67 square meters

The project is a residential building with a modern design, befitting the designs of the neighboring buildings in the area, as the location of the building is in the university district near the University of Tripoli, one of the largest public Libyan universities

Project Features

The project is considered one of the strategic locations in the capital, Tripoli, as all services are available and close to commercial markets and various service facilities, as well as the main and secondary paved roads and the lighthouse, where all public and private means of transportation are available.
The Damas 7 building in the university district is within the general plan of the Libyan state. It has a direct link to its public services, including sewage and the General Electricity Company’s network. The building also contains a private car park for its residents.

Components of the project

The property consists of:-
⦁ Single ground independent villa.
⦁ Four floors, each floor contains two apartments.
⦁ Parking for residents of the building.

Project details

villa

  • The ground floor is an independent villa with an area of ​​203 square meters, which makes good use of this space for its internal components, as follows:

    Male reception + bathroom.
    The living room with the kitchen is designed in an open space system.
    Two bedrooms for boys + bathroom.
    Master bedroom suite + bathroom + dressing room.

Apartments

Two apartments on each floor (first, second, third, fourth).
Four different areas in the apartments (201 m 2 – 196 m 2 – 172 m 2 – 140 m 2) and the apartments have (3) models that do not differ in their details too much: –

villa

  •  Villa with an area of ​​205/m2:
  • Men’s reception.
    Three bathrooms.
    three rooms.
    hall.
    kitchen.

A . model

  •  Apartment (A) with an area of ​​200/m2:-
  • three rooms.
    Three bathrooms.
    lounge.
    kitchen.
    Men’s reception.

B . model

  •  Apartment (B) with an area of ​​196.9/m2:-
  •  three rooms.
  •  Three bathrooms.
  • hall.
  • kitchen .
  • men reception.



     

C . model

  •  Its area is 130.30/m2:
  •  two rooms.
  • Men’s reception.
  • lounge.
  • kitchen.
  • Jinan has an area of ​​(51.3) m2.

D . model

  • Its area is 161.80/m2:
  • two rooms.
  • Men’s reception.
  • hall.
  • kitchen .
  • Jinan area (46.8) m2
floorCategorycodespaceSold/available
ground floorvillaF1 – GF203 m2available
1st floorapartmentF2 – FF201 m2available
1st floorapartmentF3 – FF196 m2available
2nd floorapartmentF4 – FF201 m2available
2nd floorapartmentF5 – FF196 m2available
3rd floorapartmentF6 – FF201 m2avaiable
3rd floorapartmentF7 – FF196 m2available
4th floorapartmentF8 – FOF172 m2available
4th floorapartmentF9 -FOF140 m2available

Selling as an integrated building at a price of 15,000,000 dl

Project details

 The apartments are divided into Model A, Model B, Model D and Villa.

villa

  • The ground floor is an independent villa with an area of ​​203 square meters, which makes good use of this space for its internal components, as follows:

    Male reception + bathroom.
    The living room with the kitchen is designed in an open space system.
    Two bedrooms for boys + bathroom.
    Master bedroom suite + bathroom + dressing room.

Apartments

A . model

  • Apartment (A) with an area of ​​200/m2:-
  • three rooms.
    Three bathrooms.
    lounge.
    kitchen.
    Men’s reception.

B . model

  •  Apartment (B) with an area of ​​196.9/m2:-
  • three rooms.
    Three bathrooms.
    hall.
    kitchen .
    men reception

C . model

  •  Its area is 130.30/m2:
  • two rooms.
    Men’s reception.
    lounge.
    kitchen.
    Jinan has an area of ​​(51.3) m2.

D . model

  •  Its area is 161.80/m2:
  • two rooms.
  • Men’s reception.
    hall.
    kitchen .
    Jinan area (46.8) m2
floorCategorycodespaceSold/available
ground floorvillaF1 – GF203 m2available
1st floorapartmentF2 – FF201 m2available
1st floorapartmentF3 – FF196 m2available
2nd floorapartmentF4 – FF201 m2available
2nd floorapartmentF5 – FF196 m2available
3rd floorapartmentF6 – FF201 m2avaiable
3rd floorapartmentF7 – FF196 m2available
4th floorapartmentF8 – FOF172 m2available
4th floorapartmentF9 - FOF140 m2available

Selling as an integrated building at a price of 15,000,000 dl

Payment detail

The project is under construction: the completion rate is 90%

two payments:

Down payment - 90% upon booking

Second payment - 10% upon delivery

Payment detail

The project is under construction: the completion rate is 90%

two payments:

Down payment - 90% upon booking

Second payment - 10% upon delivery